Toll Free: 1-877-289-9684  |  Live Chat 7 Days a Week
    

Page 1 of 3 123 LastLast
Results 1 to 10 of 22

Thread: Asus G75

  1. #1
    Join Date
    Apr 2012
    Location
    Brisbane, Australia
    Posts
    3
    Rep Power
    0

    Default Asus G75

    Any idea about when they will be released/in stock?

  2. #2
    Join Date
    Jan 2012
    Posts
    1,177
    Rep Power
    5

    Default

    We are looking at the embargo ending hopefully sometime at the end of this month. We cannot really say more than that at this point.

  3. #3
    Join Date
    Jul 2009
    Location
    Lincoln, Nebraska, United States
    Posts
    379
    Rep Power
    8

    Default

    Intel is rumored to release Ivy Bridge on April 23rd. So some time after that, I would think.

  4. #4

    Default

    Waiting for this.. cant wait! Hope I can get mine when it comes out. Full upgrade
    MacBook Air & ASUS G73JW - A1 with
    - Processor: - Intel® Core™ i7-940XM Extreme, 2.13-3.33GHz, (45nm, 8MB L3 cache)
    - IC Diamond Thermal Compound - CPU + GPU
    - Ram: 16,384MB (16GB) DDR3 1333MHz Dual Channel Memory (4x4GB)

  5. #5

    Default

    So whats the deal with this model? Is it worth waiting for, or should I configure something different? I want to spend about $1500 and from what I have been reading, this hits the sweet spot as far as the price point goes. Any news?

  6. #6
    Join Date
    Jan 2012
    Posts
    1,177
    Rep Power
    5

    Default

    AFAIK, it's under embargo still.

  7. #7
    Join Date
    Jul 2009
    Location
    Lincoln, Nebraska, United States
    Posts
    379
    Rep Power
    8

    Default

    Looks like they are posted on the web site now.

  8. #8
    Join Date
    May 2010
    Location
    Cable, OH
    Posts
    43
    Rep Power
    0

    Default embargo

    Quote Originally Posted by Roland@XoticPC View Post
    We are looking at the embargo ending hopefully sometime at the end of this month. We cannot really say more than that at this point.
    Please explain what the embargo is about.

  9. #9
    Join Date
    Oct 2010
    Location
    Shangri-La
    Posts
    3,695
    Rep Power
    59

    Default

    Quote Originally Posted by wtaylor View Post
    Please explain what the embargo is about.
    Intel NDAs have expired.

    The cat is out of the bag.

    Info about Ivy Bridge CPUs and series 7 chipsets is now available.

    Ivy Bridge is a tick, not a tock. Basically all it represents is a die and litho shink to 22nm, 3D transistors, and some minor enhancements; a few new opcodes, better embedded graphics, and better turbo.

    http://www.itproportal.com/2012/04/2...ure-breakdown/
    MSI GT780DX | Intel Core i7-2670QM | nVidia GTX 570M | 16 GB DDR3-1333 | 240 GB OCZ Vertex3 MI SSD | 120GB Vertex 3 MI SSD(caddy) | 2 x 240GB SanDisk Extreme SSD R0 | Tuniq TX-3 | Bigfoot Killer Wireless-N 1103(3x3) | Netgear R6300

  10. #10
    Join Date
    Jan 2012
    Posts
    1,177
    Rep Power
    5

    Default

    Pertaining to the release dates of the new G75's. . .

    G75VW-RS72 ETA: Mid-May
    G75VW-DS71 ETA: Early-May
    G75VW-DS72 ETA: Mid-May
    G75VW-DS73 ETA: Mid-May

    NOTE!!!: These are ETA's. The "E" stands for "Estimated" which means if ASUS chooses to, they can be pushed back!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  





ConnectWithUs...